Prior to Installing
The install begins before you’re even on site. Read on to see what you need to do before and when you arrive at an install.
PRE-ARRIVAL
Communicate with PhD on timing of visit
Validate all hardware is available to technician and sufficient spare stock
Verify installer has the following paper documents – leave behind document, floorplan layout
Make sure you have downloaded the SiteSage Install App
ARRIVAL
Open SiteSage Install Mobile App when you arrive at the site.
Page should show “Select Location” on top and you will have a drop down of customers.
Tap the carrot on the right to get a list of customers. Select the customer's name and tap “Confirm” button.
In the search bar enter the store name or number - the store should show below. Tap the location and confirm you are on site. The Main install page will display
Check in with Manager On Duty or gain access to location via security / lockbox (depending on customer preference).
Walk location, identify install locations.
Verify access to electrical panels and rooftop (if required), inspect panels for safety concerns (water, traffic, stacked product / boxes, etc.).
If you are installing overnight, access will be one of the following:
Lockbox (code will be provided)
Lock-in (meet the MOD on site and upon close installer stays inside location)
Guarded (Security guard on site to provide access)
Site supervisor/GC – Please note name in notes