Prior to Installing

The install begins before you’re even on site. Read on to see what you need to do before and when you arrive at an install.

PRE-ARRIVAL

  1. Communicate with PhD on timing of visit

  2. Validate all hardware is available to technician and sufficient spare stock

  3. Verify installer has the following paper documents – leave behind document, floorplan layout

  4. Make sure you have downloaded the SiteSage Install App

Download Installer App here:

Android Apple

App walkthrough video

 ARRIVAL

  1. Open SiteSage Install Mobile App when you arrive at the site.

  2. Page should show “Select Location” on top and you will have a drop down of customers.

  3. Tap the carrot on the right to get a list of customers. Select the customer's name and tap “Confirm” button.

  4. In the search bar enter the store name or number - the store should show below. Tap the location and confirm you are on site. The Main install page will display

  5. Check in with Manager On Duty or gain access to location via security / lockbox (depending on customer preference).

  6. Walk location, identify install locations.

  7. Verify access to electrical panels and rooftop (if required), inspect panels for safety concerns (water, traffic, stacked product / boxes, etc.).

If you are installing overnight, access will be one of the following:

  • Lockbox (code will be provided)

  • Lock-in (meet the MOD on site and upon close installer stays inside location)

  • Guarded (Security guard on site to provide access)

  • Site supervisor/GC – Please note name in notes

 Related articles

Related pages