Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

If installing in Canada, this portion of the install requires full shutdown of the main panel.

🪛 Energy Monitor and CT Install

  1. Locate the electrical panels

  2. Safely remove the exterior cover, following established safety protocols.

  3. Install current transformers on each circuit to be monitored

  4. Plug each current transformer into the energy monitor module, labeling each in the mobile app

  5. Install power cord for energy monitor

    1. Black to power

    2. remaining to neutral

  6. Record circuit used to power energy monitor in mobile app and label on panel schedule

    1. Ensure that the correct panel is programmed in app: WYE or Delta (208-480) or single phase

  7. Verify power light is lit for energy monitor

  8. Verify energy monitor is visible in mobile app

  9. Secure all wires in clean and orderly fashion

Install the proper CT based on the circuit voltage

Slot “0” is only used for monitoring mains 150 single CT

  • No labels