\uD83D\uDCD8 PRE-ARRIVAL
Communicate w/ PhD on timing of visit
Validate all hardware is available to technician and sufficient spare stock
Verify installer has the following paper documents – leave behind document, floorplan layout
ARRIVAL
Arrive on site
Check in to site via Open Kitchen Install Mobile App
Check in with MOD or gain access to location via security / lockbox (depending on customer preference)
Walk location, identify install locations
Verify access to electrical panels and rooftop (if required), inspect panels for safety concerns (water, traffic, stacked product / boxes, etc.)
If you are installing overnight, access will be one of the following:
Lockbox (code will be provided)
Lock-in (meet the MOD on site and upon close installer stays inside location)
Guarded (Security guard on site to provide access)
Sitesupervisor/GC – Please note name in notes