  1. Arrive on site

  2. Check in to site via Open Kitchen Install Mobile App

  3. Check in with MOD or gain access to location via security / lockbox (depending on customer preference)

  4. Walk location, identify install locations

  5. Verify access to electrical panels and rooftop (if required), inspect panels for safety concerns (water, traffic, stacked product / boxes, etc.)

...